Retender-Turnkey EPC Contract for Survey, Design, Engineering,Procurement, Construction, Integration of Interfaces, Testing & Commissioning of Transmission Line Projects
|
09-02-2023 |
Development of Distribution infrastructure at Alappuzha district of Kerala under Revamped Reforms-based and result linked Distribution Sector Scheme.Cancellation of Corrigendum .
|
23-01-2023 |
Chief Engineer, TransGrid, Shoranur, KML files of Projects In-connection with BID No. CE/TransGrid/05/22-23 dtd. 06/01/23 .
|
12-01-2023 |
Chief Engineer, TransGrid, Shoranur, Tower Schedules and Soil test . In-connection with BID No. CE/TransGrid/05/22-23 dtd.06/01/23.
|
12-01-2023 |
Chief Engineer, TransGrid, Shoranur, BID DOCUMENT Vol1 & Vol2 are attached.
|
12-01-2023 |
North South Interlinking Package -detailed profile survey and tower spotting in connection with upgradation of 66kV Aluva- Paravur feeders to 220/110kV MCMV line of 110KV to Edayar -Publication of notification North South Inter
|
10-01-2023 |