- 1912 or +91471 2555544

Download details
TransGrid 2.0 - Execution of North Green Corridor project - Formation of TC Sections at Alakode and Iritty TransGrid 2.0 - Execution of North Green Corridor project - Formation of TC Sections at Alakode and Iritty

TransGrid 2.0 - Execution of North Green Corridor project - Formation of TC Sections at Alakode and Iritty - Sanction accorded. (BO (FTD)No.778/2022 Dated: 19.09.2022).

Data

Size1.21 MB
Downloads380
Created22-09-2022

Download