TransGrid 2.0 Projects: Turnkey EPC Contract for Survey, Design, Engineering, Procurement, Construction, Integration of Interfaces, Testing & Commisioning of Transmission Line Projects 1, 2 and 3. Handing Over & Guaranteed Seven years performance TransGrid 2.0 Projects: Turnkey EPC Contract for Survey, Design, Engineering, Procurement, Construction, Integration of Interfaces, Testing & Commisioning of Transmission Line Projects 1, 2 and 3. Handing Over & Guaranteed Seven years performance

TransGrid 2.0 Projects: Turnkey EPC Contract for Survey, Design, Engineering, Procurement, Construction, Integration of Interfaces, Testing & Commissioning of following Transmission Line Projects 1, 2 and 3. Handing Over & Guaranteed Seven years performance of the completed Transmission lines.

Project 1: NSIP II (North South Interlink Package II). Project Duration - 24 Months

a. NSIP Phase IIA -220/110 KV MCMV line from Aluva to North Paravur in Ernakulam District (15 km).

b. NSIP Phase IIB -220/110 kV MCMV line from North Paravur to Kodungallur in Ernakulam/Thrissur District (15 km).

Project 2: QLP (Quilon Lines Package). Project Duration - 12 Months

Upgradation of existing 66 KV DC transmission line from East Kallada to Sasthamkotta Substation to 220/110 kV MCMV line (LILO to Kayamkulam - Kundara, 6.5 km)

Project 3: VLSP (Valluvanad Line Strengthening Package). Project Duration - 12 Months.

Construction of 220/110 kV MCMV LILO Line along the existing 66 kV ROW of Vennakkara - Nenmara Feeder (7.5 km).

Last date & time of (Online and Offline) of Submission of Bids : 02-07-2022, 11.00 AM.

PAC = ₹188,09,80,878/- (GST Exclusive)

Data

Size1.47 MB
Downloads240
Created30-05-2022
Changed10-08-2022

Download