Downloads
Overview Search Downloads Up
Category: Tenders
Page 1 of 72 «StartPrev12345678910NextEnd»
Number of Subcategories: 2
Order by: Default | Name | Date | Hits | [Descending]
Tenders Files: 854

Tenders of KSEB for download

Subcategories:
Price Bid Result Files: 1
Price Bid Result
Purchase of Power Files: 19
Purchase of Power
Files:
Construction of 33 kV Single Circuit OH line from Christ School to Kooliyangal as a part of construction of 33kV line to Kanhangad town Sub Station (labour portion)

Download

Construction of 33 kV Single Circuit OH line from Christ School to Kooliyangal as a part of construction of 33kV line to Kanhangad town Sub Station(labour portion). Last date of receipt of tender : 28-10-2014 up to 3.00 PM. Created
Size
Downloads
2014-10-01 23:36:14
189.46 KB
4
Re-Tender Notice-Extension of control room building at 66kV Substation, Changanacherry

Download

Re-Tender Notice-Extension of control room building at 66kV Substation, Changanacherry. Last date & time of receipt of tender : 28-10-2014 at 3 PM. Created
Size
Downloads
2014-10-01 23:34:14
23.52 KB
4
Re-Tender Notice-Replacing the damaged suspension string of 66kV Kuravilangadu-Ettumanoor feeder other than road crossings in between Kuravilangadu and Ettumanoor Substation

Download

Re-Tender Notice-Replacing the damaged suspension string of 66kV Kuravilangadu-Ettumanoor feeder other than road crossings in between Kuravilangadu and Ettumanoor Substation. Created
Size
Downloads
2014-10-01 23:30:44
19.43 KB
3
Clearing touchings, overhangings and Jungle clearance SEP/NEP 110kV double circuit feeder and its tap line to 110kV Substation, Erattupetta

Download

Clearing touchings, overhangings and Jungle clearance SEP/NEP 110kV double circuit feeder and its tap line to 110kV Substation, Erattupetta. Created
Size
Downloads
2014-10-01 23:21:04
18.58 KB
4
110 kV Substation Gandhi Road - Construction of foundation for structures and equipments, cable trench and cementing of the remaining portion of Compound wall at yard

Download

110 kV Substation Gandhi Road - Construction of foundation for structures and equipments, cable trench and cementing of the remaining portion of Compound wall at yard. Created
Size
Downloads
2014-10-01 22:57:31
27.39 KB
3
Hiring of each taxi car for the use of Electrical Division Office Nedumangad, TMR Division Thirumala and each taxi jeep for the use of Electrical Section Offices-Kattakkada, Amboori, Chullimanoor, Vithura, Palod, Kallara Venjarammood, Peringamala

Download

Hiring of each taxi car for the use of Electrical Division Office Nedumangad, TMR Division Thirumala and each taxi jeep for the use of Electrical Section Offices-Kattakkada, Amboori, Chullimanoor, Vithura, Palod, Kallara Venjarammood, Peringamala, Vamanapuram, Kalliyoor and Vizhinjam. Last date of receipt of tender : 17-10-2014 - 3.00 PM. Created
Size
Downloads
2014-10-01 20:46:30
42.69 KB
10
Construction of 935 m HT line and interlinking of Karumathra feeder and Manaladi feeder at Marathukunnu transformer under Electrical Section, Wadakkanchery

Download

Construction of 935 m HT line and interlinking of Karumathra feeder and Manaladi feeder at Marathukunnu transformer under Electrical Section, Wadakkanchery. Last date of receipt of tender : 20-10-2014, 3.30 pm. Created
Size
Downloads
2014-10-01 17:35:22
42.92 KB
13
Disposal of the old building in the compound of Electrical Division, Wadakkanchery

Download

Disposal of the old building in the compound of Electrical Division, Wadakkanchery. Last date and time of receipt of tender : 23-10-2014 3 PM. Created
Size
Downloads
2014-10-01 16:39:16
161.18 KB
24
PVL HEP- Repairing the camp office building, D5 Quarters and 4 Nos. E-type Quarters at Meencut colony, Painting and Urgent repair works of Pallivasal Power House, RA head works Munnar and SLM HEP- Repair the penstock track of Sengulam Power House

Download

PVL HEP- Repairing the camp office building, D5 Quarters and 4 Nos. E-type Quarters(E1,E2,E3&E4) (Civil & Electrical Work) at Meencut colony, Painting and Urgent repair works of Pallivasal Power House, RA head works Munnar, SLM HEP- Repair the penstock track of Sengulam Power House and Provide roof and urgent repair works of Sengulam Valve house building. Last date and time of receipt of tender : 16-10-2014 up to 2.00 PM. Created
Size
Downloads
2014-10-01 16:33:41
314.4 KB
16
TC Section, Mattannur-110kV DC Parambayi-Kuthuparamba Line construction - Tree cutting along the full width

Download

TC Section, Mattannur-110kV DC Parambayi-Kuthuparamba Line construction - Tree cutting along the full width. Last date of receipt of tender : 21-10-2014 3.00 PM. Created
Size
Downloads
2014-10-01 16:12:08
24.97 KB
13
Re-Tender Notice-Installation of Air Conditioners at 220kV Substation, Palakkad

Download

Re-Tender Notice-Installation of Air Conditioners at 220kV Substation, Palakkad. Last date and time of receipt of tender : 21-10-2014, 3.00 PM. Created
Size
Downloads
2014-10-01 16:08:09
75.28 KB
15
Construction of cement concrete road in substation yard at the proposed 66 KV Substation compound, Thenmala

Download

Construction of cement concrete road in substation yard at the proposed 66 KV Substation compound, Thenmala. Last date and time of receipt of tender : 18-10-2014, 2.00 PM. Created
Size
Downloads
2014-10-01 16:05:01
83.69 KB
15

Search this site

Licensed Under CC BY-SA 2.5 IN. Designed and maintained by KSEB IT Regional Unit,Kozhikode