| SALIENT FEATURES of BARAPOLE SHEP Barapole H.E. Project (15 MW, 36 MU) envisages development of power by utilizing the waters of Barapole river, a tributary of Valapattanam river. It is in Ayyankunnu Panchayath, Thalassery Taluk, Kannur District. Location (i) State : Kerala (ii) District : Kannur (iii) Taluk : Thalassery (iv) Access (a) Road : 60km north east of Kannur(via) Iritty Kuttupuzha and Kacherikkadavu (b) Rail : Nearest railway station is Kannur (c) Airport : Kozhikkode (d) Harbour : Cochin (v) Geographical co-ordinates (a) Latitude : 12o 05' 00'' N (b) Longitude : 75o 47' 30'' E | Created Size Downloads |
2010-11-27 11:22:18 37.92 KB 516 |
||
|
|
| Clean Development Mechanism-Development of H.E Projects- Stakeholder meetings at project sites. | Created Size Downloads |
2010-11-27 18:19:28 30.4 KB 399 |
||
|
|
| Construction of 33/11 kV Substation, Vellannur and accessory work related with the construction of 33/11 kV transmission lines. | Created Size Downloads |
2010-11-29 16:47:10 61.43 KB 410 |
||
|
|
| Charges and fees for Distribution work | Created Size Downloads |
2010-12-03 12:01:26 27.76 KB 1688 |
||
| Award dated 15.12.2004 of the Industrial Tribunal, Palakkad in Industrial Dispute No.27/2002 – Detailed instructions for the preparation of the State wide seniority list of petty contractors and contract line workers. | Created Size Downloads |
2010-12-30 21:02:08 10.52 MB 2175 |
||
|
|
| Preparation of the State vide Seniority list of Petty Contractors and Contract line workers. | Created Size Downloads |
2011-01-04 22:54:03 101.19 KB 1986 |
||
|
|
| Janakeeya Vydyutha Adalath- Revised schedule | Created Size Downloads |
2011-01-15 05:30:00 19.71 KB 537 |
||
|
|
| Time Extension Notice-Preparation of the State vide Seniority list of Petty Contractors and Contract line workers. | Created Size Downloads |
2011-01-17 23:02:57 13.8 KB 1298 |
||
|
|
| A stakeholder consultation meeting of the Anakkayam SHEP is to be conducted on 05.03.2011 at the project site (Government Lower Primary School, KSEB Colony) at 11.00 am. Brief detail of the project is appended along with this notification. | Created Size Downloads |
2011-01-18 16:51:12 41.41 KB 552 |
||
|
|
| The Board vide order referred 1st above accorded sanction to conduct Janakeeya Vydyutha Adalath in all District Head Quarters from 29.01.2011 to 15.02.2011 to settle all types of complaints relating to Generation, Transmission and Distribution wings from consumers/public. Further, the Board vide letter referred above revised the schedule to conduct Janakeeya Vydyutha Adalath from 29.01.2011 to 13.02.2011. | Created Size Downloads |
2011-01-27 22:42:18 19.56 KB 443 |
||
|
|
| Reckoning of Provisional service of provisional Lineman/Meter Readers. | Created Size Downloads |
2011-02-05 21:09:41 43.04 KB 1882 |
||
|
|
| Stakeholder Consultation Meeting Perunthenaruvi SHEP is a run of the river small Hydro Electric project proposed to be implemented by KSEB as a CDM project of UNFCCC. This document is published for the public and stakeholders to submit their doubts, suggestion etc. either to the Chief Engineer (Corporate Planning), Vydyuthi Bhavanam, Thiruvananthapuram or to the Chief Engineer (Civil Construction) South, Vydyuthi Bhavanam, Thiruvananthapuram in person or by post before 15.03.2011. The public/ stakeholders can also attend the stakeholder consultation meeting scheduled to be held at the Parish Hall, St. George Catholic Church, Edathukavu at 11.0 A.M. on 24.03.2011 to clarify their doubts, if any and to submit their suggestions. The important details of the scheme are as follows. | Created Size Downloads |
2011-02-14 16:06:33 53.82 KB 370 |
||