Corrigendum 3-Tender Extension Notice-Construction of office Building at Thoppumpady
|
30-11-2017 |
Retender-Supplying and drawing HT XLPE AB cable (3X150+1X120 Sq mm) along Wandoor feeder in IPDS Scheme under Electrical Section, Nilambur in Turn Key Basis
|
29-11-2017 |
Corrigendum-No:3-Constructing 4.58 km HT ABC at Edakkari 1&2 feeders, Paruthiyakom, Virippukala, Kareepally and Ettangadi and installing 4 Transformers after strengthening work of existing OH line at Electrical Section Kumarakom under DDUGJY Scheme
|
25-11-2017 |
Drawing 5km HT ABC under Electrical Section Unnikulam under DDUGJY scheme on turnkey basis
|
22-11-2017 |
Supply, Installation, testing and commissioning of HT ABC 8 km of size 3x150 and 1x120 sq mm Insulated Messenger under Electrical Circle, Tirur under IPDS Scheme
|
19-11-2017 |
Supplying, testing, installing and commissioning of 8Km LT Aerial Bunched Cable of size 3x95+1x70 +1x16 Sq.mm on existing poles on Turnkey basis in IPDS scheme in Electrical Section, Avanavanchery under Electrical Division, Attingal
|
16-11-2017 |
Drawing 6 Km of LT ABC at various locations under Electrical Division, Kazhakuttom under IPDS Scheme on turnkey basis
|
16-11-2017 |
E-Re-Tender Notice-Supply, installation, testing & commissioning of drawing of 2Km of HT ABC of size 3x120+1x95 sqmm on existing poles under Electrical section Koovappady and drawing 1 Km of HT ABC of size 3x120+1x95 sqmm on existing poles
|
15-11-2017 |
Supply and drawing ABC 3x95 sq.mm + 1x70 sq.mm Conductor for 33 KV SC line from 220kV Substation, Punnapra to proposed 33kV Substation, Kalarcode for a distance of 5 km
|
15-11-2017 |
Constructing 5.19 KM LT ABC of size 3 x 95 sq.mm + 1 x 70 sq mm (insulated messenger) + 1 x 16 sq.mm on existing poles and 1.68km LT ABC of size 3 x 95 sq.mm + 1 x 70 sq mm (insulated messenger) + 1 x 16 sq.mm(Total 6.87km) on existing poles
|
14-11-2017 |
E-Re-Tender Notice-Supply, installation, testing & commissioning of 7.75Km, HT ABC of size 3x120+1x95sqmm from 110KV Sub Station Rayonpuram to Vattakkattupady (6.5km) and from 110KV Rayonpuram Sub Station to kariyeli AB (1.25km)
|
14-11-2017 |
Drawing 10 km of LT ABC conductors at various locations in Electrical Section, Fort, Manacaud, Thiruvallam under Electrical Division, Thiruvananthapuram – under IPDS Scheme on turnkey basis
|
14-11-2017 |
Appointment of Engineering, Procurement and Construction (EPC) Contractor who are valid MNRE channel partners for the design as per site conditions, supply, installation, testing and commissioning and Operation & Maintenance Grid Tied Rooftop Solar PV
|
11-11-2017 |
Construction of office building at Thoppumpady using GFRG panel
|
11-11-2017 |
Supplying, testing, installing and commissioning of 14.5 Km LT Aerial Bunched Cable of size 3x95+1x70 +1x16 Sq.mm on existing poles on Turnkey basis in IPDS scheme in Electrical Section, Varkala under Electrical Division, Attingal
|
10-11-2017 |
Drawing 11 KV Aerial Bunched cable line length of 4.48 Km (Cable Length - 5.28 Km) from Kaduvamoozhy-Muttom - Central Junction-Aruvithura-Chennadu-Kottukappally under Electrical Section Erattupetta
|
08-11-2017 |
Supplying testing installing and commissioning of 5 Km HT ABC on existing poles from Vettakkada to Kappil Boat club on Turnkey basis in DDUGJY scheme in Electrical Section Edava under Electrical Division Attingal
|
31-10-2017 |
Construction of control room for 33kV substation Vandanmedu
|
26-10-2017 |
Supply, Construction, testing and Commissioning of 4.55 KM HT Aerial Bunched Cables at various locations under Electrical Section, Kadachira under RAPDRP Scheme, Kannur on turnkey basis
|
26-10-2017 |
Corrigendum-Constructing 4.58 Kms HT ABC at Edakkari 1& 2 feeders, Paruthiyakom, Virippukala, Kareepally and Ettangadi and installing 4 transformers after strengthening work of existing OH line at Electrical Section Kumarakom
|
26-10-2017 |