Downloads
Overview Search Downloads Up
Category: Notifications
Page 1 of 48 «StartPrev12345678910NextEnd»
Order by: Default | Name | Date | Hits | [Descending]
Notifications Files: 570
Notifications issued by kerala State Electricity Board
Files:
General Transfer - 2015 - Application invited

Download

General Transfer - 2015 - Application invited. Created
Size
Downloads
2015-03-02 22:01:03
21.1 KB
1833
Training programme for the month of April 2015 at various training institutes outside the State - Call for nominations

Download

Training programme for the month of April 2015 at various training institutes outside the State - Call for nominations. Created
Size
Downloads
2015-02-28 20:47:26
85.36 KB
625
ദൂരദര്‍ശന്‍ സ്പന്ദനം പരിപാടി

Download

ദൂരദര്‍ശന്‍ സ്പന്ദനം പരിപാടി. Created
Size
Downloads
2015-02-27 21:26:57
15.59 KB
945
Inauguration of 110 kV Substation, Kuthunkal and 33 kV Substation, Senapathy

Download

Inauguration of 110 kV Substation, Kuthunkal and 33 kV Substation, Senapathy by Shri. Aryadan Muhammed, Hon'ble Minister for Electricity on February 27, 2015 at 10 am. Created
Size
Downloads
2015-02-25 21:31:04
1.63 MB
254
കേരള സ്റ്റേറ്റ് ഇലക്ട്രിസിറ്റി ബോര്‍ഡ് ലിമിറ്റഡിന്റെ കീഴിലുള്ള ഇടുക്കി ഭൂഗര്‍ഭ ജല വൈദ്യുത നിലയത്തില്‍ (മൂലമറ്റം പവര്‍ ഹൗസ്) സ്ഥിരം ജീവനക്കാര്‍ക്ക് പ്രവേശനം നല്‍കുന്നത് - പുനരവലോകനം- സംബന്ധിച്ച്

Download

കേരള സ്റ്റേറ്റ് ഇലക്ട്രിസിറ്റി ബോര്‍ഡ് ലിമിറ്റഡിന്റെ കീഴിലുള്ള ഇടുക്കി ഭൂഗര്‍ഭ ജല വൈദ്യുത നിലയത്തില്‍ (മൂലമറ്റം പവര്‍ ഹൗസ്) സ്ഥിരം ജീവനക്കാര്‍ക്ക് പ്രവേശനം നല്‍കുന്നത് - പുനരവലോകനം- സംബന്ധിച്ച്. Created
Size
Downloads
2015-02-24 20:45:46
1.34 MB
1846
General Transfer - 2015 - Application invited

Download

General Transfer - 2015 - Application invited. Created
Size
Downloads
2015-02-24 15:57:13
19.65 KB
3280
Show cause Notice-Disciplinary action against Sri. Moideen kutty, Assistant Engineer, Relay Sub division, Shoranur

Download

Show cause Notice-Disciplinary action against Sri. Moideen kutty, Assistant Engineer, Relay Sub division, Shoranur. Created
Size
Downloads
2015-02-23 05:30:00
91.06 KB
707
General Transfer 2015 - time extension to ARU Heads for forwarding the online transfer applications submitted by the Assistant Engineers (Electrical)

Download

General Transfer 2015 - time extension to ARU Heads for forwarding the online transfer applications submitted by the Assistant Engineers (Electrical). Created
Size
Downloads
2015-02-23 22:07:28
43.16 KB
1094
Appointment to the post of Instrumentation Engineer on deputation basis in Kerala University - Application called for

Download

Appointment to the post of Instrumentation Engineer on deputation basis in Kerala University - Application called for. Created
Size
Downloads
2015-02-20 20:03:22
63.91 KB
864
Survey, Construction of 110 kV Double Circuit line from 66 kV Substation, Koothuparamba to 66 kV Substation, Nedumpoyil for the upgradation of 66 kV Substation, Nedumpoyil to 110 kV

Download

Survey, Construction of 110 kV Double Circuit line from 66 kV Substation, Koothuparamba to 66 kV Substation, Nedumpoyil for the upgradation of 66 kV Substation, Nedumpoyil to 110 kV. Created
Size
Downloads
2015-02-18 05:30:00
32.22 KB
115
Rationalization of Advertisement Tariff of News Papers – Arriving of the rates for local page releases – instructions – issued

Download

Rationalization of Advertisement Tariff of News Papers – Arriving of the rates for local page releases – instructions – issued. Created
Size
Downloads
2015-02-13 21:00:02
34.04 KB
313
General Transfer 2015- Online applications of Assistant Engineers (Ele.) - Time Extension

Download

General Transfer 2015- Online applications of Assistant Engineers (Ele.) - Time Extension. Created
Size
Downloads
2015-02-13 20:18:34
26.84 KB
1911
Licensed Under CC BY-SA 2.5 IN. Designed and maintained by KSEB IT Regional Unit,Kozhikode