Construction of 12 Km 33 kV Substation line from 110 kV Substation, Nedumangad to Aryanad in connection with the construction of 33 kV Substation at Aryanad

Download

Construction of 12 Km 33 kV Substation line from 110 kV Substation, Nedumangad to Aryanad in connection with the construction of 33 kV Substation at Aryanad. Created
Size
Downloads
2015-01-14 16:00:52
103.98 KB
114
Construction of new 33kV Transmission line cable from Chathankottunada Small Hydro Electric Project to 110 kV Substation, Kuttiyadi under Kozhikode District

Download

Construction of new 33kV Transmission line cable from Chathankottunada Small Hydro Electric Project to 110 kV Substation, Kuttiyadi under Kozhikode District. Created
Size
Downloads
2014-12-09 05:30:00
26.81 KB
135
Construction of new 110 kV line from Kakkayam-Chevayur 110 kV line to the proposed 110 kV Substation at Kinalur area under Kozhikode District

Download

Construction of new 110 kV line from Kakkayam-Chevayur 110 kV line to the proposed 110 kV Substation at Kinalur area under Kozhikode District. Created
Size
Downloads
2014-12-09 05:30:00
30.32 KB
143
Construction of 110kV DC line for 3 km from existing 110kV Kuttiady – Chevayur line to the proposed 110kV Substation Kinalur

Download

Construction of 110kV DC line for 3 km from existing 110kV Kuttiady – Chevayur line to the proposed 110kV Substation Kinalur. Created
Size
Downloads
2014-11-29 18:08:54
1.06 MB
163
Survey, Construction of 110 kV Single Circuit line from 110 kV Substation, Cheruvathur to Cheruvathur Traction Substation of Southern Railway

Download

Survey, Construction of 110 kV Single Circuit line from 110 kV Substation, Cheruvathur to Cheruvathur Traction Substation of Southern Railway. Created
Size
Downloads
2014-10-09 18:11:56
33.09 KB
199
Construction of new Kollengode - Vadakkancherry 110 kV Double Circuit line at Palakkad District

Download

Construction of new Kollengode - Vadakkancherry 110 kV Double Circuit line at Palakkad District. Created
Size
Downloads
2014-11-14 21:17:08
28.7 KB
217
Construction of 110 kV Double Circuit line for Chandranagar Sub Station, Palakkad

Download

Construction of 110 kV Double Circuit line for Chandranagar Sub Station, Palakkad. Created
Size
Downloads
2014-09-30 05:30:00
30.56 KB
247
Survey, Construction of 110 kV line from 66 kV Substation, Kothamangalam to Idamalayar Generating Station

Download

Survey, Construction of 110 kV line from 66 kV Substation, Kothamangalam to Idamalayar Generating Station.

Created
Size
Downloads
2014-03-01 23:40:58
34.17 KB
255
Inauguration of Electrical Division Wandoor

Download

Inauguration of Electrical Division Wandoor by Shri. Aryadan Muhammed, Hon'ble Minister for Electricity on December 6, 2014 at 5 pm. Created
Size
Downloads
2014-12-04 17:04:18
778.37 KB
264
Transfer Requests - 2013 of Sweeper / PTC [General]

Download

Transfer Requests - 2013 of Sweeper / PTC [General]. Created
Size
Downloads
2013-04-17 23:04:12
45.49 KB
278
Transfer Requests - 2013 of Skilled Technician [General]

Download

Transfer Requests - 2013 of Skilled Technician [General]. Created
Size
Downloads
2013-04-17 23:15:00
44.66 KB
278
Procuring of land from 30 land holders for the implementation of Mankulam Hydro Electric Project by KSE Board Limited

Download

Procuring of land from 30 land holders for the implementation of Mankulam Hydro Electric Project by KSE Board Limited. Created
Size
Downloads
2014-08-11 18:59:51
247.7 KB
318