Downloads
Overview Search Downloads Up
Category: Notifications
Page 1 of 44 «StartPrev12345678910NextEnd»
Order by: Default | Name | Date | Hits | [Descending]
Notifications Files: 526
Notifications issued by kerala State Electricity Board
Files:
Construction of new 33kV Transmission line cable from Chathankottunada Small Hydro Electric Project to 110 kV Substation, Kuttiyadi under Kozhikode District

Download

Construction of new 33kV Transmission line cable from Chathankottunada Small Hydro Electric Project to 110 kV Substation, Kuttiyadi under Kozhikode District. Created
Size
Downloads
2014-12-09 05:30:00
26.81 KB
82
Construction of new 110 kV line from Kakkayam-Chevayur 110 kV line to the proposed 110 kV Substation at Kinalur area under Kozhikode District

Download

Construction of new 110 kV line from Kakkayam-Chevayur 110 kV line to the proposed 110 kV Substation at Kinalur area under Kozhikode District. Created
Size
Downloads
2014-12-09 05:30:00
30.32 KB
101
Tariff applicable to Airports and fixed charge for consumers belonging to BPL category - Clarification issued by the KSERC

Download

Tariff applicable to Airports and fixed charge for consumers belonging to BPL category - Clarification issued by the KSERC. Created
Size
Downloads
2014-12-18 17:08:09
33.1 KB
108
Construction of 110kV DC line for 3 km from existing 110kV Kuttiady – Chevayur line to the proposed 110kV Substation Kinalur

Download

Construction of 110kV DC line for 3 km from existing 110kV Kuttiady – Chevayur line to the proposed 110kV Substation Kinalur. Created
Size
Downloads
2014-11-29 18:08:54
1.06 MB
132
Survey, Construction of 110 kV Single Circuit line from 110 kV Substation, Cheruvathur to Cheruvathur Traction Substation of Southern Railway

Download

Survey, Construction of 110 kV Single Circuit line from 110 kV Substation, Cheruvathur to Cheruvathur Traction Substation of Southern Railway. Created
Size
Downloads
2014-10-09 18:11:56
33.09 KB
178
Construction of new Kollengode - Vadakkancherry 110 kV Double Circuit line at Palakkad District

Download

Construction of new Kollengode - Vadakkancherry 110 kV Double Circuit line at Palakkad District. Created
Size
Downloads
2014-11-14 21:17:08
28.7 KB
191
Construction of 110 kV Double Circuit line for Chandranagar Sub Station, Palakkad

Download

Construction of 110 kV Double Circuit line for Chandranagar Sub Station, Palakkad. Created
Size
Downloads
2014-09-30 05:30:00
30.56 KB
228
Inauguration of Electrical Division Wandoor

Download

Inauguration of Electrical Division Wandoor by Shri. Aryadan Muhammed, Hon'ble Minister for Electricity on December 6, 2014 at 5 pm. Created
Size
Downloads
2014-12-04 17:04:18
778.37 KB
237
Survey, Construction of 110 kV line from 66 kV Substation, Kothamangalam to Idamalayar Generating Station

Download

Survey, Construction of 110 kV line from 66 kV Substation, Kothamangalam to Idamalayar Generating Station.

Created
Size
Downloads
2014-03-01 23:40:58
34.17 KB
244
Transfer Requests - 2013 of Sweeper / PTC [General]

Download

Transfer Requests - 2013 of Sweeper / PTC [General]. Created
Size
Downloads
2013-04-17 23:04:12
45.49 KB
260
Transfer Requests - 2013 of Skilled Technician [General]

Download

Transfer Requests - 2013 of Skilled Technician [General]. Created
Size
Downloads
2013-04-17 23:15:00
44.66 KB
263
Inauguration of Areekad Electrical Section Office

Download

Inauguration of Areekad Electrical Section Office by Shri. Aryadan Muhammed, Hon'ble Minister for Electricity on November 21, 2014 at 4 pm. Created
Size
Downloads
2014-11-19 20:26:45
101.29 KB
294
Licensed Under CC BY-SA 2.5 IN. Designed and maintained by KSEB IT Regional Unit,Kozhikode