100 % Electrification of LA constituencies –Appointment of Nodal Officer

Download

The Hon. Minister has announced that 100 constituencies would be completely electrified by the end of this year.Board here by re designate the post of Deputy Chief Engineer, APTS, Aluva as the ‘Nodal Officer’ for 100 % Electrification. The Deputy Chief Engineer, APTS, Aluva shall transfer all pending cases to Deputy Chief Engineer, APTS Trivandrum, so that the Nodal Officer can effectively monitor works related to 100 % electrification. Created
Size
Downloads
2010-11-11 20:52:36
36.36 KB
969
100% advance payment for the labour portion of the repair/maintenance works carried out by Original Equipment Manufacturer

Download

100% advance payment for the labour portion of the repair/maintenance works carried out by Original Equipment Manufacturer -sanctioned. Created
Size
Downloads
2013-12-13 20:22:45
33.56 KB
988
Accepting applications, complaints etc. at the field offices - Acknowledgement receipt

Download

Accepting applications, complaints etc. at the field offices - Acknowledgement receipt. Created
Size
Downloads
2009-07-09 11:46:08
28.89 KB
977
Accumulation of electricity charge arrears – Disconnection of supply to the office buildings of agreement authority

Download

After having examined, the arrear status in respect of various Government Departments, Public Sector Undertakings, Local Bodies etc., Board, vide order dated 26.03.2011 had directed the field officers to, 1. intimate the arrear status as on date to the Heads of Government Department requesting to settle the arrears within one month and highlighting the discount / rebate offer for advance payment. 2. intimate all the defaulting authorities to the effect that coercive steps including disconnection of supply will be effected to the office buildings of the agreement authority in whose name the service connection is registered, if the arrears are not settled within one month. Created
Size
Downloads
2011-07-22 05:30:00
18.49 KB
1076
Additional Guidelines for Effecting Service Connections / Clarifications Issued

Download

Additional Guidelines for Effecting Service Connections / Clarifications Issued Created
Size
Downloads
2011-08-18 23:25:43
73.29 KB
4154
Allocation of rooms in the Inspection Bungalows/Circuit Houses – entrusting the control of Inspection Bungalows/Circuit Houses to the nearest office Civil/Electrical at Assistant Executive Engineers Level for supervisory purposes

Download

Allocation of rooms in the Inspection Bungalows/Circuit Houses – entrusting the control of Inspection Bungalows/Circuit Houses to the nearest office Civil/Electrical at Assistant Executive Engineers Level for supervisory purposes- Sanctioned.

Created
Size
Downloads
2014-03-04 00:36:37
35.15 KB
1355
Annual Plan 2011-12

Download

The process of preparing the Annual Plan for the year 2011-12 started with a conference of Planning Core Committee convened by Chairman, KSEB on 17.09.2010. This was followed by review meetings of Distribution wing held on 18th, 20th and 27th September 2010 and Transmission wing held on 29th September 2010. Based on the discussions in these meetings, it was decided that due consideration shall be given to maintenance and safety in the Annual Plan 2011-12. Specific targets shall be given to each Electrical Sections for certain category of works so as to avoid disparity between Sections in identification of works. It was decided that finalisation of the Annual Plan should be completed by end of December 2010. Created
Size
Downloads
2011-02-14 18:00:01
481.17 KB
1294
Appeal No. 80/2006 of the Hon'ble State Consumer Disputes Redressal Commission Thiruvananthapuram Appeal dismissed-Compliance of the order dated 17.11.2005 in OP No. 11/2001 of Consumer Disputes Redressal Forum, Kottayam

Download

Appeal No. 80/2006 of the Hon'ble State Consumer Disputes Redressal Commission Thiruvananthapuram Appeal dismissed-Compliance of the order dated 17.11.2005 in OP No. 11/2001 of Consumer Disputes Redressal Forum, Kottayam - Sanctioned - Modification of B.O. No.2775 dated 26.11.2011. Created
Size
Downloads
2012-01-05 23:08:33
55.58 KB
578
Appointment to the post of Chief Internal Auditor in K.S.E.Board to be engaged on contract basis

Download

Establishment – Appointment to the post of Chief Internal Auditor in K.S.E.Board to be engaged on contract basis – Sanctioned. Created
Size
Downloads
2013-06-29 22:52:06
18.23 KB
1389
Arrears of Dearness Allowance – Crediting to PF Account - Time limit – Extending of

Download

Arrears of Dearness Allowance – Crediting to PF Account - Time limit – Extending of – Sanctioned. Created
Size
Downloads
2013-05-13 16:49:12
34.25 KB
2559
Arrears of electricity charges - One Time Settlement with reduction in penal interest – Time extension

Download

The Board vide its order read as 1st paper above extended the One Time Settlement scheme to settle arrears of electricity charges up to 31.03.2011 with surcharge reduced to 9% for one time payment and to 15 % for six monthly instalments with 1/3rd arrears as 1st instalment and delegated the Deputy Chief Engineers of Electrical Circles with the power to settle revenue arrears up to a principal amount of ` 2,00,000/- and the Chief Engineers (Distribution) were delegated to settle revenue arrears above ` 2,00,000/- but up to ` 4,00,000/-. The Chief Engineer (Distribution Central), Ernakulam reported that the positive responses from consumers resulted in successful utilization of the package under One Time Settlement for the realization of arrears. The delegated limits helped that office and subordinate offices to settle several cases. The Chief Engineer has recommended for the continuation of One Time Settlement scheme with further concessional rates of interests if possible for the settlement of arrears in future also. Created
Size
Downloads
2011-06-24 22:34:18
38.64 KB
991
Arrears of electricity charges - One Time Settlement with reduction in penal interest – Time extension

Download

Board decided to extend OTS Scheme to settle arrears of electricity charges up to 31.03.2012. Created
Size
Downloads
2011-12-14 18:59:38
34.23 KB
1440