100 % Electrification of LA constituencies –Appointment of Nodal Officer

Download

The Hon. Minister has announced that 100 constituencies would be completely electrified by the end of this year.Board here by re designate the post of Deputy Chief Engineer, APTS, Aluva as the ‘Nodal Officer’ for 100 % Electrification. The Deputy Chief Engineer, APTS, Aluva shall transfer all pending cases to Deputy Chief Engineer, APTS Trivandrum, so that the Nodal Officer can effectively monitor works related to 100 % electrification. Created
Size
Downloads
11-11-2010 20:52:36
36.36 KB
1103
100% advance payment for the labour portion of the repair/maintenance works carried out by Original Equipment Manufacturer

Download

100% advance payment for the labour portion of the repair/maintenance works carried out by Original Equipment Manufacturer -sanctioned. Created
Size
Downloads
13-12-2013 20:22:45
33.56 KB
1177
16.08.1999 മുതല്‍ 31.12.2003 വരെയുള്ള കാലയളവില്‍ എംപ്ലോയ്മെന്റ് എക്സ്ചേഞ്ച് മുഖേന നിയമനം ലഭിച്ച് സര്‍ക്കാര്‍വകുപ്പുകളിലും പൊതുമേഖല ഉള്‍പ്പെടെയുള്ള സ്ഥാപനങ്ങളിലും 179 ദിവസം സേവനം പൂര്‍ത്തിയാക്കിയ അംഗപരിമിതര്‍ക്ക് പുനര്‍/സ്ഥിര നിയമനം നല്കുന്നത് -സംബന്ധിച്ച്

Download

16.08.1999 മുതല്‍ 31.12.2003 വരെയുള്ള കാലയളവില്‍ എംപ്ലോയ്മെന്റ് എക്സ്ചേഞ്ച് മുഖേന നിയമനം ലഭിച്ച് സര്‍ക്കാര്‍ വകുപ്പുകളിലും പൊതുമേഖല ഉള്‍പ്പെടെയുള്ള സ്ഥാപനങ്ങളിലും 179 ദിവസം സേവനം പൂര്‍ത്തിയാക്കിയ അംഗപരിമിതര്‍ക്ക് പുനര്‍/സ്ഥിര നിയമനം നല്കുന്നതിനായി സര്‍ക്കാര്‍ പുറപ്പെടുവിച്ചിട്ടുള്ള ഉത്തരവുകളും മാര്‍ഗ്ഗ നിര്‍ദ്ദേശങ്ങളും കേരള സ്റ്റേറ്റ് ഇലക്ട്രിസിറ്റി ബോര്‍ഡ്‌ ലിമിറ്റഡില്‍ നടപ്പിലാക്കിക്കൊണ്ട് ഉത്തരവ് പുറപ്പെടുവിക്കുന്നത് - സംബന്ധിച്ച്. Created
Size
Downloads
09-07-2014 23:03:31
113.15 KB
2022
35th National Games-Request for electric connection to Stadia, without building numbers

Download

35th National Games-Request for electric connection to Stadia, without building numbers - Sanctioned. Created
Size
Downloads
28-11-2014 22:38:03
36.81 KB
929
Abolishing TCMS and 11kV Control rooms - Alternative arrangements for operational activities

Download

Abolishing TCMS and 11kV Control rooms - Alternative arrangements for operational activities - Sanctioned. Created
Size
Downloads
15-01-2015 22:11:43
2.44 MB
2854
Accepting applications, complaints etc. at the field offices - Acknowledgement receipt

Download

Accepting applications, complaints etc. at the field offices - Acknowledgement receipt. Created
Size
Downloads
09-07-2009 11:46:08
28.89 KB
1146
Accumulation of electricity charge arrears – Disconnection of supply to the office buildings of agreement authority

Download

After having examined, the arrear status in respect of various Government Departments, Public Sector Undertakings, Local Bodies etc., Board, vide order dated 26.03.2011 had directed the field officers to, 1. intimate the arrear status as on date to the Heads of Government Department requesting to settle the arrears within one month and highlighting the discount / rebate offer for advance payment. 2. intimate all the defaulting authorities to the effect that coercive steps including disconnection of supply will be effected to the office buildings of the agreement authority in whose name the service connection is registered, if the arrears are not settled within one month. Created
Size
Downloads
22-07-2011 05:30:00
18.49 KB
1224
Additional Guidelines for Effecting Service Connections / Clarifications Issued

Download

Additional Guidelines for Effecting Service Connections / Clarifications Issued Created
Size
Downloads
18-08-2011 23:25:43
73.29 KB
4611
Adoption of CPWD Data for preparation of estimates of civil works where mechanised work is not possible and adoption of CPWD SOR and National Building Code Guidelines in Kerala State Electricity Board Ltd

Download

Adoption of CPWD Data for preparation of estimates of civil works where mechanised work is not possible and adoption of CPWD SOR and National Building Code Guidelines in Kerala State Electricity Board Ltd - Sanctioned. Created
Size
Downloads
31-07-2014 18:40:46
47.84 KB
1498
Adoption of KSEB Data Book in Kerala State Electricity Board Ltd

Download

Adoption of KSEB Data Book in Kerala State Electricity Board Ltd - Sanctioned. Created
Size
Downloads
01-07-2014 16:08:07
37.15 KB
3347
Allocation of rooms in the Inspection Bungalows/Circuit Houses – entrusting the control of Inspection Bungalows/Circuit Houses to the nearest office Civil/Electrical at Assistant Executive Engineers Level for supervisory purposes

Download

Allocation of rooms in the Inspection Bungalows/Circuit Houses – entrusting the control of Inspection Bungalows/Circuit Houses to the nearest office Civil/Electrical at Assistant Executive Engineers Level for supervisory purposes- Sanctioned.

Created
Size
Downloads
04-03-2014 00:36:37
35.15 KB
1854
Annual Plan 2011-12

Download

The process of preparing the Annual Plan for the year 2011-12 started with a conference of Planning Core Committee convened by Chairman, KSEB on 17.09.2010. This was followed by review meetings of Distribution wing held on 18th, 20th and 27th September 2010 and Transmission wing held on 29th September 2010. Based on the discussions in these meetings, it was decided that due consideration shall be given to maintenance and safety in the Annual Plan 2011-12. Specific targets shall be given to each Electrical Sections for certain category of works so as to avoid disparity between Sections in identification of works. It was decided that finalisation of the Annual Plan should be completed by end of December 2010. Created
Size
Downloads
14-02-2011 18:00:01
481.17 KB
1572
Annual Plan for the year 2015-16

Download

Annual Plan for the year 2015-16 - Approved. Created
Size
Downloads
20-03-2015 17:39:47
1.71 MB
1829
Appeal No. 80/2006 of the Hon'ble State Consumer Disputes Redressal Commission Thiruvananthapuram Appeal dismissed-Compliance of the order dated 17.11.2005 in OP No. 11/2001 of Consumer Disputes Redressal Forum, Kottayam

Download

Appeal No. 80/2006 of the Hon'ble State Consumer Disputes Redressal Commission Thiruvananthapuram Appeal dismissed-Compliance of the order dated 17.11.2005 in OP No. 11/2001 of Consumer Disputes Redressal Forum, Kottayam - Sanctioned - Modification of B.O. No.2775 dated 26.11.2011. Created
Size
Downloads
05-01-2012 23:08:33
55.58 KB
741
Appointment to the post of Chief Internal Auditor in K.S.E.Board to be engaged on contract basis

Download

Establishment – Appointment to the post of Chief Internal Auditor in K.S.E.Board to be engaged on contract basis – Sanctioned. Created
Size
Downloads
29-06-2013 22:52:06
18.23 KB
1506
Arrears of Dearness Allowance – Crediting to PF Account - Time limit – Extending of

Download

Arrears of Dearness Allowance – Crediting to PF Account - Time limit – Extending of – Sanctioned. Created
Size
Downloads
13-05-2013 16:49:12
34.25 KB
2657
Arrears of Dearness Allowance – Crediting to PF Account - Time limit – Extending of

Download

Arrears of Dearness Allowance – Crediting to PF Account - Time limit – Extending of – Sanctioned. Created
Size
Downloads
22-08-2014 21:16:25
40.73 KB
1052
Arrears of electricity charges - One Time Settlement with reduction in penal interest – Time extension

Download

The Board vide its order read as 1st paper above extended the One Time Settlement scheme to settle arrears of electricity charges up to 31.03.2011 with surcharge reduced to 9% for one time payment and to 15 % for six monthly instalments with 1/3rd arrears as 1st instalment and delegated the Deputy Chief Engineers of Electrical Circles with the power to settle revenue arrears up to a principal amount of ` 2,00,000/- and the Chief Engineers (Distribution) were delegated to settle revenue arrears above ` 2,00,000/- but up to ` 4,00,000/-. The Chief Engineer (Distribution Central), Ernakulam reported that the positive responses from consumers resulted in successful utilization of the package under One Time Settlement for the realization of arrears. The delegated limits helped that office and subordinate offices to settle several cases. The Chief Engineer has recommended for the continuation of One Time Settlement scheme with further concessional rates of interests if possible for the settlement of arrears in future also. Created
Size
Downloads
24-06-2011 22:34:18
38.64 KB
1115
Arrears of electricity charges - One Time Settlement with reduction in penal interest – Time extension

Download

Board decided to extend OTS Scheme to settle arrears of electricity charges up to 31.03.2012. Created
Size
Downloads
14-12-2011 18:59:38
34.23 KB
1589
Arrears of electricity charges- One TIme Settlement – Adalath-Surcharge-revised of

Download

The Board vide its order read as 1st paper extended the One Time Settlement scheme to settle arrears of electricity charges upto 31.3.2009. As per this B.O., surcharge accrued on arrears can be reduced from 24% to 18%, if the consumer is ready to clear the arrears in six monthly instalments and to 12% if the consumer is ready to clear all the arrears in one time. If instalment facility is allowed for remitting arrear amount, 25% arrears should be collected as 1st instalment. The Deputy Chief Engineers, Electrical Circles are delegated with the power to settle revenue arrears upto a principal amount of Rs.2,00,000/- and the Chief Engineers (Distribution) are delegated to settle revenue arrears above Rs.2,00,000/- but upto Rs.4,00,000/- The Board authorised the FTMs to settle arrears above Rs.4,00,000/- Created