Downloads
Overview Search Downloads Up
Category: Board Orders
Page 1 of 41 «StartPrev12345678910NextEnd»
Number of Subcategories: 2
Order by: Default | Name | Date | Hits | [Descending]
Board Orders Files: 487

Board Orders

Subcategories:
Tariff Orders Files: 3
Tariff related Orders.
General Tariff Orders Files: 1
General Tariff Orders
Files:
Scheme for Reward to informants (SRI) for furnishing information leading to detection of theft of energy and to officers for successfully detecting theft of energy punishable under the Electricity Act, 2003

Download

Scheme for Reward to informants (SRI) for furnishing information leading to detection of theft of energy and to officers for successfully detecting theft of energy punishable under the Electricity Act, 2003 Created
Size
Downloads
2006-03-03 14:31:28
45.51 KB
702
Introduction of new system of Collection of electricity charges from consumer's through Bank - Sanction accorded

Download

At present, electricity charges are being collected at various Electrical Section Offices of KSEB mostly in cash or through local cheques. In order to enhance services of the Board to its consumers, a new system of payment of electricity charges through bank by an arrangement of debit advice from consumers against their designated bank account has been envisaged. A meeting was convened on 31-08-2007 for discussing the proposal with officials of our four collecting banks. Representatives of State Bank of Travancore, Canara Bank and Union Bank of India attended the meeting. The purpose of the proposed arrangement is to facilitate an easy way to pay the periodical electricity bills by the consumer having a bank account. Created
Size
Downloads
2007-12-05 14:49:27
18.72 KB
646
Handing over the metering equipments of dismantled H.T Service to the consumers themselves

Download

In the case of HT consumers, the metering equipments such as CT/PT units and TOD meters are procured by the consumers while availing new connection. While dismantling such connections, these equipments are not seized by the Board at present. At this juncture, the Deputy Chief Engineer, Electrical Circle, Palakkad has requested clarification on the following points vide letter read above. i. whether the metering equipments are to be taken by KSE Board or not while dismantling HT connections. Created
Size
Downloads
2008-01-21 14:54:06
29.69 KB
584
Cellular Mobile towers - Providing electric connection and assigning tariff

Download

In continuation of the Circulars under reference and consequent to the clarifications requested by the field officers, the following directions are issued in providing electric connection and assigning tariff to the cellular mobile towers. 1. 1. The present practice of giving temporary connection may be continued after getting an undertaking as per item (5) below till the Kerala State Electricity Regulatory Commission takes a decision on the issue Created
Size
Downloads
2008-01-21 14:57:46
17.63 KB
963
Revision of target date of Voltage Improvement works, normal OH, weather proof service connection and OYEC-PIS-Sanctioned

Download

Having reviewed the existing targets and achievements thereon, the Board has decided to accord sanction to revise the target date of :- 1. Voltage Improvement works up to date 2. Normal Overhead service connection to 01.01.2008 3. Normal weather proof service connection to 01.01.2008 4. OTP - OH (Out of Turn Priority Overhead) services to 01.01.2008 5. BPL- OH (Below Poverty Line – Overhead) services to 01.01.2008 Created
Size
Downloads
2008-02-02 15:06:04
28.76 KB
659
Unauthorized use of Electricity - Assessment of electricity charges - Method of penalization

Download

The Executive Engineer, Electrical Division, Ponkunnam sought clarification regarding the methodology to be adopted while issuing penal bills in the case of unauthorized additional load. The Kerala State Electricity Regulatory Commission clarified vide letter read as 2nd paper that penalty rate is applicable to both fixed and energy charges for the unauthorized use of Electricity as per sub-section (6) of Sn 126 of Electricity (Amendment) Act, 2007 which states that the assessment under this section shall be made at a rate equal to twice the tariff applicable for the relevant category of services specified in sub section (5). As per sub section (5) of section 126 of Electricity (Amendment) Act, 2007, if the assessing officer reaches to the conclusion that unauthorized use of electricity has taken place, the assessment shall be made for the entire period during which such unauthorized use of electricity has taken place and if, however, the period during which such unauthorized use of electricity has taken place cannot be ascertained, such period shall be limited to a period of twelve months immediately preceding the date of inspection. The appointed date for bringing into force the Electricity (Amendment) Act, 2007 is 15.06.2007. Created
Size
Downloads
2008-02-07 15:09:59
30.79 KB
1894
Handing over the metering equipments of dismantled High Tension Service to the consumers themselves - Erratum

Download

In partial modification of the Board Order read above, the Board hereby issue the following correction to the last paragraph in the above Board Order as follows:- Having considered the matter in detail, sanction is accorded to the field officers to handover the metering equipments of dismantled HT service to the consumers themselves, as the materials have been procured by the consumers subject to the condition that there are no pending arrears and dispute regarding meter reading, accuracy of meter or metering equipments. Created
Size
Downloads
2008-02-15 15:13:46
29.16 KB
554
Payment of Electricity Charges of the PWD Rest Houses and Various Offices of the PWD (B&LW) - Time Extension - Sanctioned

Download

Sri. K. Sundaran, Chief Engineer, Building and Local Works and Ex-officio Additional Secretary to Government, Public Works Department has informed that the disconnection of power supply to PWD Rest Houses due to the non-payment of electricity charges causes extreme hardships as the PWD Rest Houses are being occupied by the Ministers and other top officials including Judicial Officers, Commissions for holding enquiry proceedings etc. It is stated that by the end of the financial year, the dues will be almost cleared. The Chief Engineer requested not to disconnect the power supply of the PWD Rest Houses abruptly and without due notices to the concerned with sufficient time. Created
Size
Downloads
2008-02-18 15:17:29
30.97 KB
522
Regularization of unauthorized cable TV Operators - Extension of cut off date - Sanctioned

Download

As per the Board Order read as 1st above, all unauthorized CTV connections can be regularized with effect from the date of payment of 3 times the floor rate fixed by the Board from the date of unauthorized connection and the cut off date for regularizing the unauthorized connection was fixed as 01.11.2002. Later it was extended upto 31.12.2006 vide Board order read as 2nd and 3rd above. The Member (Distribution) vide note read as 4th above has suggested to revise the cut off date for regularization of unauthorized CTV connections upto 31.03.2008, since a large number of unauthorized connections are existing and will help to realize a considerable revenue to the Board. Created
Size
Downloads
2008-02-18 15:44:20
30.81 KB
616
Scheme for reward to informants / Officers for detection of theft of energy - Clarifications

Download

Board had implemented a scheme for cash award to the informants (SRI), who give information leading to successful detection of theft of electricity and also to the officers, who detect theft of energy resulting in actual realization of additional income to the Board, vide order read as 1st paper above. The conditions for eligibility of the same were also incorporated in the Board order. Further, Board had approved certain guidelines for issuance of incentive to APT squad vide order read as 2nd paper above. Created
Size
Downloads
2008-03-25 15:51:05
36.41 KB
721
Computerization in KSEB - Formation of various Functional Committees for the development of application software - Sanctioned

Download

Computerization in KSEB - Formation of various Functional Committees for the development of application software - Sanctioned. Created
Size
Downloads
2008-03-26 15:54:07
192.23 KB
763
Direct remittance of electricity charges by Mobile Telecom Companies by RTGS/NEFT mode - sanctioned

Download

Direct remittance of electricity charges by Mobile Telecom Companies by RTGS/NEFT mode - sanctioned. Created
Size
Downloads
2008-04-24 15:56:59
38.34 KB
701
Licensed Under CC BY-SA 2.5 IN. Designed and maintained by KSEB IT Regional Unit,Kozhikode